Check the mandatory HMO route first
Large HMOs occupied by at least five people in at least two households, sharing facilities, usually require a mandatory licence in England.
This rule applies to houses. Shared flats, converted buildings, resident landlords, statutory exemptions and unusual arrangements need council review. Planning permission is separate.
Local additional licensing needs a separate council check. It does not replace a mandatory licensing requirement. Start with the people, households, shared facilities and building type.
Official mandatory HMO guidance ↗ · Read the England HMO licence guide
National rule evidence reviewed 2026-11-01.
Collect plans, certificates and tenancy evidence
Collect plans, certificates and tenancy evidence
The application checklist includes proof of address, applicable gas and electrical reports, fire detection and emergency lighting reports, portable appliance testing, a room-size plan, current tenancy information, deposit arrangements and a fire risk assessment. Use Residential Services at residential.services@rbwm.gov.uk to clarify what applies to the property.
Keep invoice, draft and grant records distinct
Follow the council’s instruction not to send a fee with the application. The new application page describes a draft licence and a 21-day representation period; the renewal page has its own invoice and final-notice sequence. Confirm the actual correspondence and conditions, and use the renewal link before expiry rather than treating the old grant as transferable.
Before an application
- Use the application evidence list, wait for the council invoice and renew before actual licence expiry.
- Send the exact address, occupancy and property layout to the council before relying on an uncertain licensing answer.
Reviewed additional HMO records
No designation record of this type has been published in the checker for this council. The guidance above explains the reviewed local evidence and next steps. This is not a finding that no licensing requirement exists; use the council's current application service and confirm your property with it.
Questions about Windsor and Maidenhead HMO licensing
Can a three or four person HMO in Windsor and Maidenhead need a licence?
Read Windsor and Maidenhead's current HMO guidance and confirm the local position with the council. This page has no additional-HMO checker record and does not infer an exemption for smaller HMOs. National mandatory rules remain a separate check.
What happens when an additional designation reaches its end date?
Ask the council for the adopted notice and any replacement scheme. This page has no additional-HMO checker record. An announcement or consultation does not establish a successor, and an individual licence expiry is separate from the designation end date.
Does this page cover flats, converted buildings and exemptions?
The checker handles houses, and flats let to one household. Shared flats, converted buildings, resident landlords and a possible exemption require individual council review. Read the record caveat and the full official notice before relying on the occupancy threshold.
Does an HMO licensing result establish planning permission or an existing licence?
No. The result compares entered property facts with available reviewed rules. It does not search for a licence already held, verify its holder or resolve planning requirements. Ask the council about those separate checks.