Check the mandatory HMO route first
Large HMOs occupied by at least five people in at least two households, sharing facilities, usually require a mandatory licence in England.
This rule applies to houses. Shared flats, converted buildings, resident landlords, statutory exemptions and unusual arrangements need council review. Planning permission is separate.
Local additional licensing needs a separate council check. It does not replace a mandatory licensing requirement. Start with the people, households, shared facilities and building type.
Official mandatory HMO guidance ↗ · Read the England HMO licence guide
National rule evidence reviewed 2026-11-01.
Use the new or renewal application route
Use the new or renewal application route
The dedicated HMO page links different forms for a new property and an existing licence renewal, plus the relevant payment and fee pages. It requires a written fire risk assessment prepared by a competent person with the application. Read the proposed licence conditions and local room, amenity and fire standards before submitting.
Check the grant and public register together
Wigan publishes a register of licensed HMOs, but the actual licence determines occupation and conditions. Local standards apply beyond mandatory licensing. Ask Housing Standards about a converted building or self-contained flats rather than treating the broad HMO definition as an automatic mandatory-licensing test.
Before an application
- Use the dedicated HMO service; ask Housing Standards to resolve inconsistent smaller-HMO wording.
- Send the exact address, occupancy and property layout to the council before relying on an uncertain licensing answer.
Reviewed additional HMO records
No designation record of this type has been published in the checker for this council. The guidance above explains the reviewed local evidence and next steps. This is not a finding that no licensing requirement exists; use the council's current application service and confirm your property with it.
Questions about Wigan HMO licensing
Can a three or four person HMO in Wigan need a licence?
Read Wigan's current HMO guidance and confirm the local position with the council. This page has no additional-HMO checker record and does not infer an exemption for smaller HMOs. National mandatory rules remain a separate check.
What happens when an additional designation reaches its end date?
Ask the council for the adopted notice and any replacement scheme. This page has no additional-HMO checker record. An announcement or consultation does not establish a successor, and an individual licence expiry is separate from the designation end date.
Does this page cover flats, converted buildings and exemptions?
The checker handles houses, and flats let to one household. Shared flats, converted buildings, resident landlords and a possible exemption require individual council review. Read the record caveat and the full official notice before relying on the occupancy threshold.
Does an HMO licensing result establish planning permission or an existing licence?
No. The result compares entered property facts with available reviewed rules. It does not search for a licence already held, verify its holder or resolve planning requirements. Ask the council about those separate checks.