Check the mandatory HMO route first
Large HMOs occupied by at least five people in at least two households, sharing facilities, usually require a mandatory licence in England.
This rule applies to houses. Shared flats, converted buildings, resident landlords, statutory exemptions and unusual arrangements need council review. Planning permission is separate.
Local additional licensing needs a separate council check. It does not replace a mandatory licensing requirement. Start with the people, households, shared facilities and building type.
Official mandatory HMO guidance ↗ · Read the England HMO licence guide
National rule evidence reviewed 2026-11-01.
A case reference is required before the application
A case reference is required before the application
The council asks applicants to register first and obtain a case reference, then quote that number when paying. The registration is not the HMO application; complete the separate electronic or postal form afterwards.
Read the locally linked standards and holder checks
Solihull says managers and holders need a DBS check, and links its fit-and-proper policy and amenities/fire guidance. It warns that the guidance can vary with the HMO, so resolve property-specific requirements with the council.
Before an application
- Obtain the Solihull case reference before payment and application.
- Send the exact address, occupancy and property layout to the council before relying on an uncertain licensing answer.
Reviewed additional HMO records
No designation record of this type has been published in the checker for this council. The guidance above explains the reviewed local evidence and next steps. This is not a finding that no licensing requirement exists; use the council's current application service and confirm your property with it.
Questions about Solihull HMO licensing
Can a three or four person HMO in Solihull need a licence?
Read Solihull's current HMO guidance and confirm the local position with the council. This page has no additional-HMO checker record and does not infer an exemption for smaller HMOs. National mandatory rules remain a separate check.
What happens when an additional designation reaches its end date?
Ask the council for the adopted notice and any replacement scheme. This page has no additional-HMO checker record. An announcement or consultation does not establish a successor, and an individual licence expiry is separate from the designation end date.
Does this page cover flats, converted buildings and exemptions?
The checker handles houses, and flats let to one household. Shared flats, converted buildings, resident landlords and a possible exemption require individual council review. Read the record caveat and the full official notice before relying on the occupancy threshold.
Does an HMO licensing result establish planning permission or an existing licence?
No. The result compares entered property facts with available reviewed rules. It does not search for a licence already held, verify its holder or resolve planning requirements. Ask the council about those separate checks.