London · MANDATORY AND ADDITIONAL HMO ROUTES

Redbridge HMO licensing

Redbridge licenses ordinary shared houses through the mandatory or additional HMO route. Its local designation also addresses certain converted blocks, which need a building-specific review rather than a headcount alone.

Evidence reviewed 1 published additional recordCheck property facts ↓
A reviewed designation is an initial reference

The checker covers houses, flats let to one household and available records. Shared flats, converted buildings, exceptions, missing schemes and older evidence need council review.

Borough-wide additional HMO licensing and selective schemes 3 and 4 reviewed. Both schemes follow whole wards, so the checker answers selective licensing from the postcode’s ward; converted buildings remain manual.

Check the mandatory HMO route first

Large HMOs occupied by at least five people in at least two households, sharing facilities, usually require a mandatory licence in England.

This rule applies to houses. Shared flats, converted buildings, resident landlords, statutory exemptions and unusual arrangements need council review. Planning permission is separate.

Local additional licensing needs a separate council check. It does not replace a mandatory licensing requirement. Start with the people, households, shared facilities and building type.

Official mandatory HMO guidance ↗ · Read the England HMO licence guide

National rule evidence reviewed 2026-11-01.

Redbridge HMO licensing: smaller shared houses and converted blocks

Three or four residents can need a licence

The council’s current guidance directs shared homes with three or four residents in two or more households to additional licensing. The borough-wide designation began on 18 September 2023. Mandatory HMO licensing takes priority where its criteria are met.

Converted flats need ownership and building-history checks

Redbridge’s local notice includes certain section 257 converted blocks when all units are privately rented and under the same ownership or control. Blocks with no more than two flats are excluded from that provision. Ask the council to assess conversion standards and control of the building.

Use the HMO checklist and keep planning separate

Redbridge asks for floor plans, a fire risk assessment, fire detection documents and relevant safety certificates. It says a planning problem does not remove the need to apply for an HMO licence. Keep the actual licence expiry and conditions available for renewal.

Before an application

  • Use the ordinary-house check only for a house with known occupancy, households and shared facilities.
  • Send converted-block or uncertain exemption questions to Redbridge’s licensing team.
  • Check planning permission and the current application documents before changing the property’s use.

Reviewed additional HMO records

Each linked record has its own source, period and scope. These dates describe the scheme, rather than the expiry of an individual licence. Check the council’s current application service and fee before applying.

Additional HMO licensing

Borough-wide additional HMO licensing 2023

Redbridge’s additional designation covers eligible ordinary shared houses across the borough outside mandatory HMO licensing.

Recorded start Recorded end

Area: Whole London Borough of Redbridge, as defined by Annex A of the 2023 adopted notice.

The checker models ordinary houses with shared facilities only. Converted blocks, flats, missing amenities and exemptions require manual review.

Exclusions to confirm

  • Homes requiring mandatory HMO licensing use that route.
  • Statutory exclusions, management orders and temporary exemptions need council confirmation.

Before an application

  • Check household composition and shared facilities before applying.
  • Use Redbridge’s current application checklist and fee schedule.

Reviewed · Revision 1

Questions about Redbridge HMO licensing

Can a three or four person HMO in Redbridge need a licence?

The published additional HMO records below describe the smaller shared houses included by Redbridge. Read their occupancy criteria, period and exclusions. A five or more person house may instead meet the national mandatory criteria; people and households are separate facts.

What happens when an additional designation reaches its end date?

The dates below describe the reviewed designation. An announcement or consultation does not establish a successor. Confirm any replacement with the council, and keep the expiry printed on an individual property licence separate from the scheme end date.

Does this page cover flats, converted buildings and exemptions?

The checker handles houses, and flats let to one household. Shared flats, converted buildings, resident landlords and a possible exemption require individual council review. Read the record caveat and the full official notice before relying on the occupancy threshold.

Does an HMO licensing result establish planning permission or an existing licence?

No. The result compares entered property facts with available reviewed rules. It does not search for a licence already held, verify its holder or resolve planning requirements. Ask the council about those separate checks.

Official evidence for this report

The review date records when evidence was checked. It does not extend a designation, validate an exact boundary or replace the council’s decision. Read coverage and review limits.

LANDLORD PRO

Keep the property record ready for the next change.

A free check answers today’s question. Monitoring checks each saved address every day and emails you when a scheme changes or a licence or certificate date comes up.

Reviewed rule changes

Follow published changes for supported councils. Partial-area designations still need an exact address check.

Dates and reminders

Record actual licence and certificate deadlines and get reminders 90, 60, 30, 14 and 7 days before each one, and on the day.

A small portfolio

Pro is designed for up to ten properties. Pricing is £144 a year or £15 paid monthly, separate from council fees.