Check the mandatory HMO route first
Large HMOs occupied by at least five people in at least two households, sharing facilities, usually require a mandatory licence in England.
This rule applies to houses. Shared flats, converted buildings, resident landlords, statutory exemptions and unusual arrangements need council review. Planning permission is separate.
Local additional licensing needs a separate council check. It does not replace a mandatory licensing requirement. Start with the people, households, shared facilities and building type.
Official mandatory HMO guidance ↗ · Read the England HMO licence guide
National rule evidence reviewed 2026-11-01.
Mole Valley: contact the service and prepare inspection evidence
Contact the service and prepare inspection evidence
Mole Valley directs HMO applicants to 01306 885001 and links the GOV.UK application form. It assesses management, bedroom sizes, amenities and fire measures. Its evidence list includes gas, fixed electrical installation, energy, fire-alarm and emergency-lighting certificates where applicable.
Notify the team even for a smaller HMO
The council expressly asks to be made aware of HMOs that do not require an HMO licence because an inspection may be needed for fire safety. It provides a public register and local standards; these are useful assessment sources, rather than proof that an unlisted address is exempt.
Before an application
- Contact the council and collect applicable safety certificates.
- Notify the team of a smaller HMO and check local standards.
Reviewed additional HMO records
No designation record of this type has been published in the checker for this council. The guidance above explains the reviewed local evidence and next steps. This is not a finding that no licensing requirement exists; use the council's current application service and confirm your property with it.
Questions about Mole Valley HMO licensing
Can a three or four person HMO in Mole Valley need a licence?
Read Mole Valley's current HMO guidance and confirm the local position with the council. This page has no additional-HMO checker record and does not infer an exemption for smaller HMOs. National mandatory rules remain a separate check.
What happens when an additional designation reaches its end date?
Ask the council for the adopted notice and any replacement scheme. This page has no additional-HMO checker record. An announcement or consultation does not establish a successor, and an individual licence expiry is separate from the designation end date.
Does this page cover flats, converted buildings and exemptions?
The checker handles houses, and flats let to one household. Shared flats, converted buildings, resident landlords and a possible exemption require individual council review. Read the record caveat and the full official notice before relying on the occupancy threshold.
Does an HMO licensing result establish planning permission or an existing licence?
No. The result compares entered property facts with available reviewed rules. It does not search for a licence already held, verify its holder or resolve planning requirements. Ask the council about those separate checks.