Mid Sussex: property licensing and local application checks
Prepare the local certificate and plan pack
Mid Sussex asks for an electrical report within five years, fire-alarm test evidence within twelve months, emergency-lighting evidence where installed, gas and appliance information, and a sketch plan showing room positions and sizes. It offers online and paper applications and normally inspects during the licence period.
Ask for a current selective designation
The reviewed Mid Sussex material explains HMO licensing and safety standards, but does not settle the current selective licensing position. Ask the council for any adopted designation, its operative dates and the exact address coverage. An HMO register or an unsuccessful search cannot establish that a single-household rental needs no licence.
Which local scheme should I check?
Read the council-specific guidance above and the linked HMO and selective reports. No local designation record has been published in this checker for this council. That does not establish that no scheme exists or that your property is exempt.
Before relying on a property result
- Check the dates on the certificates and sketch-plan measurements.
- Keep the small-HMO statement separate from selective licensing.