Paper HMO applications are no longer accepted
Prepare the online evidence before starting
The council expressly says it no longer accepts paper applications. Its checklist includes measured plans showing the kitchen layout and fire arrangements, alongside relevant safety certificates.
Allow for a property assessment
The published process takes at least six weeks and can take longer. The page expressly rejects automatic consent through silence, and the granted period may be shorter where works or management concerns require it.
Which local scheme should I check?
Read the council-specific guidance above and the linked HMO and selective reports. No local designation record has been published in this checker for this council. That does not establish that no scheme exists or that your property is exempt.
Before relying on a property result
- Prepare the complete measured plans and upload checklist for online submission.
- Follow the inspection and actual grant rather than assuming consent through silence.
- Use the HMO register map only for its property-record purpose.
- Request current selective designation evidence from Private Sector Housing.
Exclusions and separate checks
- This council guide does not add an automated local scheme rule or resolve an exact address.
- Planning, building control and individual licence conditions need separate checks.